Wells FT-18 Manuel d'utilisateur Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 6
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
Updated for 2nd Semi-annual (Jan - June) 2015
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Labour Composite
Ref. Tech.
Specs.
Sr. No. Description Unit
Rate (Rs.)
26- 8
5.3
a) 1 : 1.5 : 3 Cu.m. 1,194.90 13,935.40
Cu.ft. 33.85 394.60
b) 1 : 2 : 4 Cu.m. 1,194.90 12,336.50
Cu.ft. 33.85 349.35
26- 9 Providing and fixing structural steel for cutting edge. % Kg. 1,539.05 13,002.15
26.4
% Lb. 698.10 5,897.75
Cu.m. 1,744.85 6,763.90
4.1
Cu.ft. 49.40 191.55
Making and removing false masonry on well including its
dismantling and cost of scraping bricks.
Providing, making and laying R.C.C. well curb in position
using 3/4" (19mm) and down gauge crushed aggregate and
coarse sand including formwork, moulds, shuttering,
rendering the exposed surface including curing. The
reinforcement will be paid separately.
26- 10
26 - 6 (SINKING OF WELLS)
Vue de la page 5
1 2 3 4 5 6

Commentaires sur ces manuels

Pas de commentaire